Critical Path
Dan Sunil monogram
Reference

Project Management Glossary

24 terms, defined the way a practitioner would explain them to a colleague.

Baseline
The approved version of scope, schedule or cost against which performance is measured. Changed only through change control.
Burndown chart
Remaining work plotted against time in a sprint or release; the slope forecasts the completion date.
Charter
The document that authorises the project and grants the project manager authority to spend resources.
Contingency reserve
Budget or time set aside for identified risks, controlled by the project manager.
Critical path
The longest dependent sequence of activities; determines the minimum project duration.
Definition of Done
The shared checklist an increment must satisfy before it can be called complete.
Earned Value (EV)
The budgeted cost of work actually completed to date.
Float (slack)
How long an activity can be delayed without delaying the project end date.
Gold plating
Adding unrequested features or polish; unpaid scope creep generated from inside the team.
Increment
A usable, potentially releasable slice of the product produced within a single iteration.
Issue
A risk that has materialised, or a present problem requiring resolution.
Milestone
A zero-duration marker of a significant point or event in the schedule.
Product backlog
The single ordered list of everything that might be needed in the product.
RACI
Responsibility matrix: Responsible, Accountable, Consulted, Informed.
Risk register
The living log of identified risks with owner, probability, impact, response and review date.
Resource levelling
Adjusting start and finish dates to fit resource availability, even if the project end date moves out.
Resource smoothing
Rescheduling activities within their float so resource limits are respected without changing the critical path.
Rolling wave planning
Planning near-term work in detail and distant work at a high level, refining as it approaches.
Scope creep
Uncontrolled expansion of scope without adjustment to time, cost and resources.
Sprint goal
The single objective a sprint serves, giving the team room to negotiate the details.
Stakeholder
Anyone who can affect, be affected by, or perceive themselves affected by the project.
Triple constraint
The interdependence of scope, time and cost, with quality as the consequence of squeezing them.
Velocity
Story points completed per sprint; a forecasting input for one team, never a cross-team metric.
Work package
The lowest level of the WBS: a deliverable that can be estimated, scheduled and owned.