A project plan is the agreed statement of what will be delivered, in what order, for how much, and by whom. This pack splits that into the two artifacts it actually needs: a plan document that carries the scope, cost, accountability and change-control decisions, and a schedule worksheet that carries the tasks, dependencies, dates and float.

Keeping them separate is deliberate. The document changes only through approved change control, so it stays short and signable. The worksheet changes weekly, because that is where dates move. Teams that mash both into one deck end up with a fifty-slide artifact nobody baselines and nobody updates.

PMI standard alignment
Standard followed
PMBOK Guide 7th ed. / PMI Practice Standard for Scheduling
Performance domain
Planning
Process group
Planning
Knowledge area
Integration & Schedule Management

The Word, Excel & PDF files for this template are part of the paid PM Delivery Toolkit — there is no free download. The full walkthrough, worked example and section guidance below stay open to read.

Get the project plan pack in the toolkit

When to use it

  • A charter has been signed and you now need the plan that turns it into dates and money.
  • Your schedule lives in a tool nobody outside the team can open, so governance has no baseline.
  • Dates keep slipping and nobody can say which tasks have float and which do not.
  • A stage gate or PMO asks for a baselined plan before spend is released.
  • You inherited a project with a task list but no scope boundary, cost plan or change process.

Every section, and what good looks like

  1. Section 1

    Plan control (document)

    Project name, sponsor, project manager, version, baseline date and next review date.

    A version number that increments only on approved change, so everyone knows which copy is live.

  2. Section 2

    Scope baseline (document)

    Objectives, in-scope and out-of-scope lists, acceptance criteria, and the WBS-to-work-package table.

    Every work package has an owner and an obvious acceptance route — someone can say yes or no to it.

  3. Section 3

    Schedule summary (document)

    Six to eight governance dates, each labelled as a target or a commitment, plus the critical path note.

    Task-level detail stays in the worksheet; the document carries only the dates governance tracks.

  4. Section 4

    Task rows (worksheet)

    ID, task, owner, duration in working days, predecessor IDs, start, calculated finish, total float and status.

    No task longer than about ten working days, so slippage shows up inside a single reporting cycle.

  5. Section 5

    Float and critical flag (worksheet)

    Total float per task, with a formula that flags any zero-float row as critical.

    Float is re-derived after every change, not carried over from the first baseline.

  6. Section 6

    Milestones tab (worksheet)

    Baseline date, forecast date and a calculated variance in days for each milestone.

    The baseline column is frozen; only the forecast column moves week to week.

  7. Section 7

    Cost and resource plan (document)

    Budget, committed spend and tolerance per category, plus named resource assumptions with dates.

    Contingency is a line of its own rather than padding hidden inside estimates.

  8. Section 8

    Accountability (document)

    Decision rights for sponsor, project manager, technical lead and business owner.

    Detailed task-level responsibility is delegated to the RACI matrix instead of duplicated here.

  9. Section 9

    Change control and approval (document)

    What triggers a change request, the approval thresholds, and the signature block.

    Approved changes are re-baselined in the worksheet and the document version is incremented the same day.

A filled-in example

The first eight rows of the schedule worksheet, filled in for a planning phase, so you can see how duration, predecessors and float sit together before you baseline.

Worked project plan pack example
Row 1Confirm charter and objectives — Project manager, 3 days, no predecessor, starts 1 Sep, float 0, critical.
Row 2Build WBS to work packages — Project manager, 4 days, predecessor 1, float 0, critical.
Row 3Estimate effort with the team — Delivery lead, 3 days, predecessor 2, float 0, critical.
Row 4Sequence tasks and set dependencies — Project manager, 2 days, predecessor 3, float 0, critical.
Row 5Confirm resource allocations — Resource manager, 3 days, predecessor 3, float 2 — can slip two days without moving the baseline.
Row 6Baseline cost plan — Finance partner, 2 days, predecessor 3, float 4.
Row 7Agree RAID responses — Project manager, 2 days, predecessor 4, float 3.
Row 8Baseline the plan and publish — Sponsor, 1 day, predecessors 4, 5, 6 and 7, float 0, critical.
Reading itThe zero-float chain 1 → 2 → 3 → 4 → 8 is the critical path; rows 5, 6 and 7 have room to move. Paste the worksheet into the critical path calculator to re-derive float after any change.

Mistakes that make a project plan stale by week three

  • Starting with dates instead of scope, so the plan documents a wish rather than a commitment.
  • One giant task called "build", which hides slippage until it is too late to recover.
  • Never entering float, so every task looks equally urgent and the real critical path stays invisible.
  • Overwriting the baseline column when dates move, which destroys the variance you need to report.
  • No named owner per row — a team name means nobody is accountable for the date.
  • Changing the schedule without a change request, so the document and the worksheet quietly disagree.
  • Baselining once and never reviewing, until the plan is a historical document rather than a control.
Paid toolkit

26 more artifacts, ready to fill in

The PM Delivery Toolkit packages the RAID log, status pack, estimation and earned value workbooks, capacity planner, agile sprint tools and 150 PMP-style questions — Word, Excel and print-ready PDF.

  • Status pack and steering deck with RAG logic built in
  • Estimation and EVM workbook: CPI, SPI and EAC calculated
  • Capacity planner with an over-allocation heatmap
  • Agile set: sprint planning, user stories, retros, backlog, WSJF
What’s inside all 26 artifacts

One payment · lifetime updates · 14-day refund. Files unlock on your download page as soon as payment clears.

Questions people ask

What is in this project plan template pack?
Two artifacts: a nine-section plan document in Word and PDF covering plan control, scope baseline, schedule summary, cost, accountability, RAID, communication, change control and sign-off; and an Excel schedule worksheet with a task schedule tab, a milestone baseline-versus-forecast tab and a how-to-use tab.
What is the difference between a project plan and a project schedule?
The plan answers what, why, how much and who, and changes only through approved change control. The schedule answers when and in what order, and is updated weekly. The pack keeps them as separate files for exactly that reason.
Is the schedule worksheet free to use commercially?
No. Both files follow the PMBOK Guide planning structure and ship inside the paid PM Delivery Toolkit. Once you buy the toolkit you can rename and reuse them on any project inside your organisation.
Does the worksheet calculate the critical path automatically?
It calculates finish dates from duration and flags any row with zero total float as critical. To derive early and late dates and float from scratch, paste your tasks into the free critical path calculator on this site and copy the float column back into the worksheet.
How long should a project plan be?
Around eight to ten pages for the document. If it is longer, detail that belongs in the schedule worksheet, the RAID log or the stakeholder register has been pasted into the plan instead of referenced from it.
How often should the plan and schedule be updated?
Update the schedule worksheet weekly and the milestone forecast column at the same time. Update the plan document only when an approved change request moves scope, cost or a committed date — then increment the version.

Read next

Other PMI-standard templates

Every one has the same walkthrough, worked example and PMI mapping, and every file ships inside the PM Delivery Toolkit.

Keep going on the site

The hubs and tools that pair with this project plan pack.

Free tips

Get five PM habits that quietly save projects

Baselines, critical path discipline, RAID logs that people read, range estimating and status packs sponsors act on — sent straight to your inbox, free.

One email, no spam, unsubscribe any time.